Skip to content

Orlando International Airport Terminal C Phase 1

Bergelectric has been working under the direction of Hensel Phelps on South Terminal C Phase 1 since May of 2018. The 822,000-s.f. Airside Terminal for the Greater Orlando Aviation Authority (GOAA) will feature 15 gates with a flexible configuration that…

Read more
Back To Top