Location
Palm Springs, CA
Electrical Construction Cost
$1 Million
General Contractor
Reno Contracting
Details
117 Solar Canopies
7MW Capacity
School District Energy Upgrades
Together with Sun Edison, Reno Contracting and ELEN Consulting Engineers, Bergelectric’s design build team installed 117 solar canopies and 4 rooftop systems across ten sites for the Palm Springs Unified School District. A total of 21,794 MEMC modules were installed for a combined capacity of 7 MW dc.
RENEWABLE ENERGY
Similar Projects
Presidio, TX
Sacramento, CA
Palm Springs, CA