Location
Beverly Hills, CA
Size
883,000 sq. ft.
Electrical Construction Cost
$45.4 Million
General Contractor
Jacobsen Swinerton JV
Delivery Method
Design Build
Revitalizing Hollywood’s Iconic Mall
A condensed (30-month) schedule was put in place by the Jacobsen-Swinerton Joint Venture that began in March 2016. Detailed coordination between all trades was heightened for the renovation due to the Beverly Center’s commitment to remain in full operation. One of the biggest challenges for this massive renovation project was keeping the Beverly Center in operation during ongoing renovations.