Location
Orlando, FL
Size
822,000 sq. ft.
Electrical Construction Cost
$47 Million
General Contractor
Hensel Phelps
Delivery Method
Design Build
An Easier and Faster Way to Travel
Bergelectric has been working under the direction of Hensel Phelps on South Terminal C Phase 1 since May of 2018. The 822,000-s.f. Airside Terminal for the Greater Orlando Aviation Authority (GOAA) will feature 15 gates with a flexible configuration that will serve both international and domestic flights, accommodating up to 10 million passengers annually.
Federal & Municipal
Similar Projects
Santa Clara, CA
Austin, TX
Austin, TX
Orlando, FL